Juq-123
JUQ-123 — Detailed Overview
- RF certification delays → engage certified lab early; pre-test with in-house EMC scans.
- Battery sourcing constraints → qualify two suppliers; redesign for alternate form factors.
- OTA brick risk → dual-bank firmware layout and verified bootloader with watchdog.
- Supply chain lead times → order long-lead components at NPI; consider component substitutions.
- Security vulnerabilities → periodic third-party pen tests; static analysis in CI.
2.3. Cell Culture and Primary Samples
- Product Manager — requirements, roadmap, prioritization.
- Hardware Engineer — schematic, PCB, BOM, test fixtures.
- Firmware Engineer — MCU selection, drivers, BLE/GATT, power management.
- Software Engineer — mobile app and cloud APIs.
- QA/Verification — test plans, automated tests, compliance prep.
- Manufacturing & Supply Chain — vendors, assembly, testing.
- Regulatory/Compliance — certifications and documentation.
Project timeline (9-month plan — high level)